CAPACITOR PACK for PUMPS LISTED BELOW S3HRC500M2-2
When the probe is submersed
Zoeller D295 Series Sewage & Dewatering Pump Features and Benefits
The BERS-0800 HEX Base Elbow Rail System is designed for engineered pump stations with flanged discharges and pull-outs to accommodate larger pumps
Remote failure indication
Topp FB30X078 30" x 78" Fiberglass Basin Basin Options:S = Steel Anti-Floatation Flange CAPACITOR PACK for PUMPS LISTEDTOPP Fiberglass Basins TOPP Fiberglass Basins are made with the highest quality material and testing standards currently in the wastewater. water treatment, sewage and sump markets. Our chop hoop filament wound tanks are available in 18", 24", 30", 36", 42", 48", 60", 72", 96" and 120". 239 U. S. Gallons TOPFB30X078 = Basin Only TOPFB30X078F = Fiberglass Anti Floatation Flange TOPFB30X078S = Steel Anti Floatation Flange LIDS SOLD SEPERATELY